28 August 2013

"Ten Thousand Bridges" Installation Day 3

It took a crew of over 20 people to prepare the 150 Bridge panels (each 4 m. wide), 600 m. of steel cable and clear tubing, pulley systems, and color schemes.



Measuring and cutting the sections of cable and preparing them with rubber tubing.


 
Each section from A to E is 22-30 m. long. 

Installing the 1st section from the Boddhisattva to BIA's Building (15 m.)






Installing the 2nd section through the first floor of the building. (20 m.)


Preparing the 2rd section to go over the lake to the Nalikae island (100 m.)